Artifact

Ramboland Team Meetings (2025)

June 13, 2025
People
jharper
kim marcellus
theresajordan98
haycookkris
ronrrambo
jremlin
jesse
james
boecker
jmg97
samhorochowski
cadams
raup8580
spenser yost
hawa decafarms
sheffer
cllove
ewbaldwin
gjohn411
kimberlee zamora
louziegler
marcussheffer
maxzahniser
thumma
twdevenney
tylerthumma
Banner
Links & Files
Summary

Sam Horochowski

Contact Croft directly for initial meeting to discuss greenhouse integration and construction details (41:02)

Determine insulation values for vestibule roof plane and address thermal bridging details (58:57)

Submit architect license application with completed reference forms (16:25)

Marcus Sheffer

Pick a swamp cooler model for greenhouse climate control system with Tyler, Eric and Noah (39:28)

John Boecker

Schedule architectural team call to discuss vestibule/glowing box detailing and cow wall system integration (58:22)

Research U-values and solar heat gain coefficients for north-facing operable windows (01:09:33)

John Gould

Review and return final book galleys to publisher within three weeks (11:06)

James

Continue website functionality development and complete remaining fixes (23:42)

  • Website content is nearly complete; James will address functionality fixes this weekend, with a target completion by the next meeting to enhance community engagement.
  • Greenhouse design updates include eliminating the walkway for better space utilization and a new lift system for wheelchair access, emphasizing improved accessibility.
  • A decision was made to replace the skylight with dome bubbles for ventilation, aiming to enhance air circulation within the greenhouse.
  • Preliminary recommendations for ground air systems from Introba were discussed, focusing on climate control needs for the greenhouse.
  • Construction documents nearing completion with two projects set to be permitted next week; background drawings have been sent for the permit process.
  • The project timeline is currently two weeks behind, aiming for a permit submission by July 7 and a community event that influences a million-dollar decision in late August.
  • Critical thermal bridging considerations were raised regarding the vestibule design, with a focus on insulation strategy for both inner and outer walls.
  • The structural integrity of the cow wall system was favored, but questions remain regarding door frame integration and supporting the roof within the vestibule.
  • Final details for energy modeling and plumbing are still pending, with next steps in the construction timeline closely aligned with Sam’s expected baby arrival.
  • The selection process for swamp cooler models will involve collaboration among Marcus, Tyler, Eric, and Noah to finalize climate control solutions.<p>- Website content is nearly complete; James will address functionality fixes this weekend, with a target completion by the next meeting to enhance community engagement.
  • Greenhouse design updates include eliminating the walkway for better space utilization and a new lift system for wheelchair access, emphasizing improved accessibility.
  • A decision was made to replace the skylight with dome bubbles for ventilation, aiming to enhance air circulation within the greenhouse.
  • Preliminary recommendations for ground air systems from Introba were discussed, focusing on climate control needs for the greenhouse.
  • Construction documents nearing completion with two projects set to be permitted next week; background drawings have been sent for the permit process.
  • The project timeline is currently two weeks behind, aiming for a permit submission by July 7 and a community event that influences a million-dollar decision in late August.
  • Critical thermal bridging considerations were raised regarding the vestibule design, with a focus on insulation strategy for both inner and outer walls.
  • The structural integrity of the cow wall system was favored, but questions remain regarding door frame integration and supporting the roof within the vestibule.
  • Final details for energy modeling and plumbing are still pending, with next steps in the construction timeline closely aligned with Sam’s expected baby arrival.
  • The selection process for swamp cooler models will involve collaboration among Marcus, Tyler, Eric, and Noah to finalize climate control solutions.</p><p>

<b>Sam Horochowski</b>

Contact Croft directly for initial meeting to discuss greenhouse integration and construction details (41:02)

Determine insulation values for vestibule roof plane and address thermal bridging details (58:57)

Submit architect license application with completed reference forms (16:25)

<b>Marcus Sheffer</b>

Pick a swamp cooler model for greenhouse climate control system with Tyler, Eric and Noah (39:28)

<b>John Boecker</b>

Schedule architectural team call to discuss vestibule/glowing box detailing and cow wall system integration (58:22)

Research U-values and solar heat gain coefficients for north-facing operable windows (01:09:33)

<b>John Gould</b>

Review and return final book galleys to publisher within three weeks (11:06)

<b>James</b>

Continue website functionality development and complete remaining fixes (23:42)

</p>

Initiatives
No items found.
Meeting Transcript

https://app.fireflies.ai/view/Ramboland-Team-Meetings-2025-::01JXGFDRQ6X8W4GH4KDMAC6944