Summary

Max Zahniser

Coordinate and schedule a field trip to the Pro Care accessibility showroom with Ron, Lou, and interested team members, ensuring van transport is arranged and considering Max's availability (afternoons, except Friday the 6th) (16:01)

Marcus Sheffer

Update energy model to reflect gravity-fed irrigation and recent envelope changes; coordinate with Tyler and Sam for details (48:44)

Theresa Jordan

Confirm with Chris that the new elevated cistern is included in plumbing drawings and that gravity-fed irrigation is feasible for all greenhouse needs (49:57)

Chris Adams

Explore the feasibility of adding a manual hand pump (with electric backup) for educational purposes to transfer water from the main cistern to the elevated cistern (50:00)

Aaron (last name not specified)

Send updated DWG/CAD backgrounds to Cheryl for grading plan updates, ensuring Aaron's redlines are incorporated and topography issues are addressed (57:01)

John Boecker

Provide latest site plan with spot elevations and driveway slopes to Cheryl to support grading and site coordination (59:12)

Cheryl Love

Run vehicle turning movement analysis (including van and truck) to optimize parking layout, reclaim green space, and ensure accessibility; update site plan accordingly (01:07:03)

Sam Horochowski

Ask Aaron to send Cheryl the latest G100 drawing with redlines and parking configuration details (01:10:46)

  • Field Trip Coordination: Max Zahniser to organize a visit to the Pro Care accessibility showroom in June, involving Ron, Lou, and other interested team members. Transport arrangements needed; afternoons preferred for scheduling (no availability on June 6th).

  • Stormwater Management Plan: Multi-cistern system detailed: 9,600-gallon breezeway cistern, 2,700-gallon cylindrical cistern, ~1,000-gallon elevated cistern. Gravity-fed irrigation preferred; confirmation required from Chad and Chris on feasibility.

  • Grading Plan Updates: Cheryl ready to update grading plans post-receipt of updated CAD backgrounds from Aaron. Key discussions on site elevation accuracy and sidewalk accessibility; greenhouse finished floor set at 30 inches below grade for thermal efficiency.<p>- <b>Field Trip Coordination</b>: Max Zahniser to organize a visit to the Pro Care accessibility showroom in June, involving Ron, Lou, and other interested team members. Transport arrangements needed; afternoons preferred for scheduling (no availability on June 6th).

  • <b>Stormwater Management Plan</b>: Multi-cistern system detailed: 9,600-gallon breezeway cistern, 2,700-gallon cylindrical cistern, ~1,000-gallon elevated cistern. Gravity-fed irrigation preferred; confirmation required from Chad and Chris on feasibility.

  • <b>Grading Plan Updates</b>: Cheryl ready to update grading plans post-receipt of updated CAD backgrounds from Aaron. Key discussions on site elevation accuracy and sidewalk accessibility; greenhouse finished floor set at 30 inches below grade for thermal efficiency.</p><p>

<b>Max Zahniser</b>

Coordinate and schedule a field trip to the Pro Care accessibility showroom with Ron, Lou, and interested team members, ensuring van transport is arranged and considering Max's availability (afternoons, except Friday the 6th) (16:01)

<b>Marcus Sheffer</b>

Update energy model to reflect gravity-fed irrigation and recent envelope changes; coordinate with Tyler and Sam for details (48:44)

<b>Theresa Jordan</b>

Confirm with Chris that the new elevated cistern is included in plumbing drawings and that gravity-fed irrigation is feasible for all greenhouse needs (49:57)

<b>Chris Adams</b>

Explore the feasibility of adding a manual hand pump (with electric backup) for educational purposes to transfer water from the main cistern to the elevated cistern (50:00)

<b>Aaron (last name not specified)</b>

Send updated DWG/CAD backgrounds to Cheryl for grading plan updates, ensuring Aaron's redlines are incorporated and topography issues are addressed (57:01)

<b>John Boecker</b>

Provide latest site plan with spot elevations and driveway slopes to Cheryl to support grading and site coordination (59:12)

<b>Cheryl Love</b>

Run vehicle turning movement analysis (including van and truck) to optimize parking layout, reclaim green space, and ensure accessibility; update site plan accordingly (01:07:03)

<b>Sam Horochowski</b>

Ask Aaron to send Cheryl the latest G100 drawing with redlines and parking configuration details (01:10:46)

</p>

Initiatives
No items found.
Meeting Transcript

https://app.fireflies.ai/view/Ramboland-Team-Meetings-2025-::01JWCDW3EWMZEVE8YRYJCGDW2W