Max Zahniser
Coordinate and schedule a field trip to the Pro Care accessibility showroom with Ron, Lou, and interested team members, ensuring van transport is arranged and considering Max's availability (afternoons, except Friday the 6th) (16:01)
Marcus Sheffer
Update energy model to reflect gravity-fed irrigation and recent envelope changes; coordinate with Tyler and Sam for details (48:44)
Theresa Jordan
Confirm with Chris that the new elevated cistern is included in plumbing drawings and that gravity-fed irrigation is feasible for all greenhouse needs (49:57)
Chris Adams
Explore the feasibility of adding a manual hand pump (with electric backup) for educational purposes to transfer water from the main cistern to the elevated cistern (50:00)
Aaron (last name not specified)
Send updated DWG/CAD backgrounds to Cheryl for grading plan updates, ensuring Aaron's redlines are incorporated and topography issues are addressed (57:01)
John Boecker
Provide latest site plan with spot elevations and driveway slopes to Cheryl to support grading and site coordination (59:12)
Cheryl Love
Run vehicle turning movement analysis (including van and truck) to optimize parking layout, reclaim green space, and ensure accessibility; update site plan accordingly (01:07:03)
Sam Horochowski
Ask Aaron to send Cheryl the latest G100 drawing with redlines and parking configuration details (01:10:46)
<b>Max Zahniser</b>
Coordinate and schedule a field trip to the Pro Care accessibility showroom with Ron, Lou, and interested team members, ensuring van transport is arranged and considering Max's availability (afternoons, except Friday the 6th) (16:01)
<b>Marcus Sheffer</b>
Update energy model to reflect gravity-fed irrigation and recent envelope changes; coordinate with Tyler and Sam for details (48:44)
<b>Theresa Jordan</b>
Confirm with Chris that the new elevated cistern is included in plumbing drawings and that gravity-fed irrigation is feasible for all greenhouse needs (49:57)
<b>Chris Adams</b>
Explore the feasibility of adding a manual hand pump (with electric backup) for educational purposes to transfer water from the main cistern to the elevated cistern (50:00)
<b>Aaron (last name not specified)</b>
Send updated DWG/CAD backgrounds to Cheryl for grading plan updates, ensuring Aaron's redlines are incorporated and topography issues are addressed (57:01)
<b>John Boecker</b>
Provide latest site plan with spot elevations and driveway slopes to Cheryl to support grading and site coordination (59:12)
<b>Cheryl Love</b>
Run vehicle turning movement analysis (including van and truck) to optimize parking layout, reclaim green space, and ensure accessibility; update site plan accordingly (01:07:03)
<b>Sam Horochowski</b>
Ask Aaron to send Cheryl the latest G100 drawing with redlines and parking configuration details (01:10:46)
</p>